I have got our EHO to update the Permits to install and alter a septic system to include the following wording:

“This permit is also report and consent of Macedon Ranges Shire Council to the installation or alteration of the septic tank system as required by Regulation 801 of the Building Interim Regulations 2017. You are advised that a building permit must be obtained prior to any construction work commencing.”

Building Surveyors issuing permits from us will be able to use the permit to install/alter as it is now also consent and report of Council.
Still waiting on notification to industry from the VBA and DELWP that R&C is required.